Inicio / Conocimiento / Túnel de mineros Oviedo Impermax 2K
Túnel de mineros Oviedo Impermax 2K

Notas de ingeniería. No un blog. Simulation tunnel, Miners’ Training Centre, Oviedo. Túnel de mineros Oviedo Impermax 2K (bicomponente poliuretano) is the membrana nominada. No area is given.
Túnel de mineros Oviedo Impermax 2K (bicomponente proyectado en caliente poliuretano) is the membrane named on the simulation tunnel at the Miners’ Training Centre, Oviedo. Therefore the specifier writes Impermax 2K and the tunnel use in the same sentence. Magazine NUM.3 prints no area. Do not invent one.
What Túnel de mineros Oviedo Impermax 2K may carry
Catalogue 2024 prints ETA 10/0296, 25 years (W3), on Impermax 2K, plus root-penetration and asbestos-encapsulation certificates. An aliphatic acabado is required where the membrane sees UV. A training-centre geometry is still a tunnel clause, not a gym floor.
However, do not invent kg/m². Do not borrow a kilogram rate from a Rayston Proof system sheet. Read the current TDS, then the calculadora.
See Túnel de mineros Oviedo Impermax 2K on tunnels, Impermax 2K and documentos.
Outbound reference: EOTA — European Technical Assessments.
First, name the simulation tunnel. Then name Túnel de mineros Oviedo Impermax 2K. After that, keep the area blank until a drawing gives it.
These notes do not replace the current TDS, SDS or a written specification. For pack sizes, mix ratio and kg/m², read the current sheet, then the calculadora.

