Nursery School Cool Roof Waterproofing in Rome, 2,000 square metres in 2024. Italia. The products on the job are Impermax Polyurea H. Italia is the setting, and the exposure is what chooses the build-up.

Project case study Nursery School Cool Roof Waterproofing in Rome This nursery school cool roof project in Rome covers the Asilo Nido Calimero, about 2,000 m².

First, the crew removed failed areas and washed the deck.

Next, they laid a self-adhesive bituminous sheet and primed it with TP Flex.

Krypton Chemical supplies the resin system. The duty is ordinary and strict: keep water, wear and weather on the right side of the structure, and do it in the details as well as in the open field.

ProjectNursery School Cool Roof Waterproofing in Rome
PlaceItalia
Area2,000 m²
Year2024
LineWaterproofing
ProductsImpermax Polyurea H

02 · The challenge

What did this structure ask of the system?

A roof is a field of outlets, laps and edges, and the weather works on all of them. Water does not leak through the middle of a sound bay. It gets in where the detail was thin or where the deck has started to move.

Nursery School Cool Roof Waterproofing in Rome has to be closed as one system, details first, and then left to do its job without a second visit every summer. Across 2,000 square metres, a thin spot is not a small repair.

Curved roof perimeter of the Calimero nursery before works
Curved roof perimeter of the Calimero nursery before works

03 · The solution

Which system was trusted here?

The system trusted here is the one named for the job: Impermax Polyurea H. It is chosen because it matches the substrate and the exposure, not because every building wants the same can.

On a roof the membrane has to follow outlets and upstands at the same thickness as the field. An exposed aromatic film takes a topcoat if the colour will be seen.

04 · Application

How is the system built?

Impermax is the cold liquid polyurethane. Stir it slowly, let the bubbles rise, and lay it by roller, brush or airless spray. Two coats in different colours, about 1 kg per square metre each, make the coverage obvious. A spiked roller knocks bubbles down while the film is wet. Outlets, upstands and cracks are detailed first. Keep the deck between 5 and 40 degrees C, and keep it dry.

On a warm day a coat is walkable in one or two days. About 90 percent of final properties arrive in three days, and full hardness takes 10 to 15 days. Wait that long before the surface is held under water. Typical elongation is 450 to 600 percent. The resin is aromatic, so a roof left in the sun is given an aliphatic topcoat if the colour has to stay true. Again, these are datasheet figures, not a reading taken on Nursery School Cool Roof Waterproofing in Rome.

On Nursery School Cool Roof Waterproofing in Rome the roof fails at the edge long before it fails in the field. Parapets, outlets, plant plinths and laps are detailed first, with the same system, at the same thickness. A bay can be perfect and the ceiling still stains if the outlet was a collar of mastic.

The deck moves between the hot afternoon and the night. The membrane has to move with it. A rigid coat maps every crack in the substrate onto the ceiling. Thermal movement is the reason an elastic system is on a roof like this, not a preference for a particular can.

Where the film stays in the sun, colour and waterproofing are two layers. The membrane keeps the water out. An aliphatic coat keeps the appearance. Skipping the topcoat because the membrane is already waterproof is how a sound roof starts to look failed, and then gets recoated for the wrong reason.

05 · Results

What does a job like this stand behind?

Nursery School Cool Roof Waterproofing in Rome has one standard. The coating is still doing its job after the building is back in use, at the details as well as in the middle. The area on this job is 2,000 square metres.

Figures for cure, thickness and strength, where they are given, come from the product data sheets. They are not a test cut out of this building.

What this asks of Nursery School Cool Roof Waterproofing in Rome is workmanship at the difficult line. The open field is the easy part of a resin job. Outlets, edges, penetrations and changes of plane are where thickness goes missing, and where water or wear finds the gap. The same products and the same care belong there, and the cure is allowed to finish before the building goes back into use. That is the difference between a coating that was simply applied and a system that stays in service.

06 · Products

Products on this job

Impermax Polyurea H

Named on this project. The data sheet carries the application window and the typical figures.

Technical data sheet

07 · FAQ

Frequently asked questions

Where is this project?

Nursery School Cool Roof Waterproofing in Rome. Italia

When was the work done?

2024.

Which products were used?

Impermax Polyurea H.

Why are the details done first?

Outlets, upstands and joints are where water gets in. They are closed with the same system as the main area.

Are the figures measured on this job?

No. Thickness, elongation and cure times quoted here are the products’ typical data.

08 · Photos

On site

Nursery school cool roof in Rome: finished light-grey Colodur topcoat over Polyurea H
Nursery school cool roof in Rome: finished light-grey Colodur topcoat over Polyurea H
Curved roof perimeter of the Calimero nursery before works
Curved roof perimeter of the Calimero nursery before works
Applicator rolling the light-grey Colodur topcoat, Rome nursery
Applicator rolling the light-grey Colodur topcoat, Rome nursery
Self-adhesive bituminous sheet being laid on the nursery roof
Self-adhesive bituminous sheet being laid on the nursery roof
Finished light-grey nursery school roof seen from above, Rome
Finished light-grey nursery school roof seen from above, Rome
Cracked terracotta tile roof at the Calimero nursery before works, Rome
Cracked terracotta tile roof at the Calimero nursery before works, Rome
Weeds and broken tiles on the old nursery roof, Rome
Weeds and broken tiles on the old nursery roof, Rome
Field of failed tiles before removal on the Calimero roof
Field of failed tiles before removal on the Calimero roof
Roof edge overgrown with plants before cleaning, Rome nursery
Roof edge overgrown with plants before cleaning, Rome nursery
Blue bituminous sheet following the curved nursery roof deck
Blue bituminous sheet following the curved nursery roof deck
Wide view of the blue bituminous layer across the Calimero roof
Wide view of the blue bituminous layer across the Calimero roof
Roof field at the bituminous prep stage, Calimero nursery
Roof field at the bituminous prep stage, Calimero nursery
S-curved roof edge before the Colodur topcoat, Rome
S-curved roof edge before the Colodur topcoat, Rome
Prepared curved roof plate under clear sky, Rome nursery
Prepared curved roof plate under clear sky, Rome nursery
Aerial view of the nursery roof mid-works, Rome
Aerial view of the nursery roof mid-works, Rome
Nursery roof at membrane stage before the light finish
Nursery roof at membrane stage before the light finish
Completed continuous roof membrane at the Calimero nursery
Completed continuous roof membrane at the Calimero nursery

Talk to our technical team about your project

Tell us the substrate, the traffic and the exposure.

Contact us

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top