What is this project?

School Court Flooring in Alcañiz, 900 square metres in 2021. España – Aragón. The products on the job are Floortop 1K. España – Aragón is the setting, and the exposure is what chooses the build-up.

The next is an amateur sports court on the school yard.

Sports surface: Rayston Floor PU 10, with an activator primer, Floortop 1K and aggregate 0.1/0.3.

Impermax Polyurea H Flex is a two-part polyurea for hot spray.

Krypton Chemical supplies the resin system. The duty is ordinary and strict: keep water, wear and weather on the right side of the structure, and do it in the details as well as in the open field.

ProjectSchool Court Flooring in Alcañiz
PlaceEspaña – Aragón
Area900 m²
Year2021
LineFlooring
ProductsFloortop 1K

02 · The challenge

What did this structure ask of the system?

School Court Flooring in Alcañiz is a working floor. Wheels, washing water and the daily grit of a building all sit on the same film. A coating that only looks right on the day it is laid will map every crack in the slab within a season.

The concrete has to be opened, not painted over. Laitance, oil and old dust are how resin floors lose their bond, and they lose it in the traffic lines first. Joints and drains are details, not the edge of the job. Across 900 square metres, a thin spot is not a small repair.

Yellow and white lines on the blue school court
Yellow and white lines on the blue school court

03 · The solution

Which system was trusted here?

The system trusted here is the one named for the job: Floortop 1K. It is chosen because it matches the substrate and the exposure, not because every building wants the same can.

A floor system is a stack. Primer for the bond, body for the thickness, seal for the face. Skipping the primer to save a day is how the floor comes back up on the tyres.

04 · Application

How is the system built?

On this floor the sequence follows the products named for the job: Floortop 1K. The slab is ground or blasted, the dust is lifted, and cracks are filled before the first resin. A primer is what locks the system into the pores. The body coat takes the wear. The seal is the face people walk on, and it is the layer that has to keep its colour.

Each coat has to be down at the thickness that product is designed for, including at the drains and the joints. A floor that is thick in the middle and starved at the edge will fail at the edge. Traffic waits until the seal has cured. Washing water waits longer than footsteps.

On School Court Flooring in Alcañiz the floor is not a decorative coat. It is the surface the building works on. Preparation decides it. Oil, laitance and a closed power-floated face will take a primer for a week and then let it go. The mechanical opening of the pores is part of the system, not a favour the applicator adds if there is time.

Joints move. A resin that is rigid across a joint will crack there, and the crack fills with wash water. The joint is either honoured, with a flexible seal of the right width, or the floor design accepts a cut. Drains are turned into the floor, not left as a ring of mastic after the last coat. Colour goes in the seal coat so a repair later can be matched, and so daylight and cleaning chemicals meet a film that was chosen for that, not the structural coat underneath.

Cure is part of the programme. Foot traffic, pallet trucks and the first wash are three different dates. Opening a floor early because the building is in a hurry is how a good system gets a bad name. The data sheet of each named product sets those dates. This page does not invent a shorter one for the sake of the story.

05 · Results

What does a job like this stand behind?

School Court Flooring in Alcañiz has one standard. The coating is still doing its job after the building is back in use, at the details as well as in the middle. The area on this job is 900 square metres.

Figures for cure, thickness and strength, where they are given, come from the product data sheets. They are not a test cut out of this building.

What this asks of School Court Flooring in Alcañiz is workmanship at the difficult line. The open field is the easy part of a resin job. Outlets, edges, penetrations and changes of plane are where thickness goes missing, and where water or wear finds the gap. The same products and the same care belong there, and the cure is allowed to finish before the building goes back into use. That is the difference between a coating that was simply applied and a system that stays in service.

06 · Products

Products on this job

Floortop 1K

Named on this project. The data sheet carries the application window and the typical figures.

07 · FAQ

Frequently asked questions

Where is this project?

School Court Flooring in Alcañiz. España – Aragón

When was the work done?

2021.

Which products were used?

Floortop 1K.

Why does the concrete preparation matter?

Resin sticks to a clean, open slab. It does not stick to laitance or oil. The bond fails in the wheel tracks first.

When can the floor take traffic?

Foot traffic waits until the seal has cured. Wheels and wash-down wait longer. The exact window is the one in each product’s data sheet.

08 · Photos

On site

Blue and green school court between apartment blocks in Alcañiz
Blue and green school court between apartment blocks in Alcañiz
Yellow and white lines on the blue school court
Yellow and white lines on the blue school court
Blue court with a green surround between the school buildings
Blue court with a green surround between the school buildings
The full court seen from an upper floor
The full court seen from an upper floor

Talk to our technical team about your project

Tell us the substrate, the traffic and the exposure.

Contact us
Scroll to Top