01 · Project overview

What is this project?

Hurghada lives on the Red Sea. Hotels there sell the water, and the pools have to look right and stay tight under chlorine, heat and a long season. Sindbad Hotel put 2,500 square metres of pool lining into that duty in 2023.

ETS sprayed a pure polyurea made by Krypton. On a pool, that choice is about corners, outlets and a film that does not wait a week to be safe under water.

PlaceSindbad Hotel, Hurghada
Area2,500 m²
Year2023
SystemPure polyurea by Krypton
ApplicatorETS

02 · The challenge

What did this structure ask of the membrane?

Steps, skimmers and floor-to-wall joints are where pool linings open. The water is warm, treated, and permanent. A jointed lining will find a way to peel.

03 · The solution

Which Krypton system was trusted here?

Pure polyurea, sprayed hot, wraps those details in one continuous film and gels before the gun has moved on. That is the right chemistry for a shell that will be full for months at a time.

04 · Application

How is this system built?

Concrete is prepared before any resin goes down. Polyurea Rayston, Krypton’s hot-spray pure polyurea, wants a support that is flat, compact and cohesive. Pull-off strength should be at least 1.4 N/mm2. Cracks are cut out and filled first. High-pressure sand or abrasion opens the pores, and the dust is vacuumed off. Moisture in the concrete must sit under 4 percent. Concrete temperature belongs between 10 and 40 degrees C, and the air should be under 85 percent relative humidity. If damp is suspected behind the slab, two coats of epoxy primer go on, the second one blinded with quartz sand. Metal is cleaned and primed with a polyurethane primer. That bond is what stops a blister when the structure heats up.

A pool stays full. Chlorine, warm water and bare feet at the edge all sit on the same lining. Outlets, steps and corners are where a weak detail shows up first.

Spraying is hot and fast. Both components are brought to about 25 to 30 degrees C before they are loaded. In the machine they run hotter: about 65 degrees C on the resin, 75 degrees C on the isocyanate, and 65 degrees C in the hose. Pressure at the gun is at least 140 bar. The usual build is 1.5 to 2.0 kg/m2, which leaves a film about 1.5 to 2 mm thick. Gel time is about 4 seconds at 25 degrees C. The surface is tack-free in a matter of seconds, not hours. Hardness climbs from roughly 28 Shore A at five minutes to about 88 Shore A after four days. One pass should make the thickness. Where a corner needs a second pass, it should follow within about two hours.

Speed is the practical gift on a crowded site. Upstands, outlets and internal corners can be closed before the next trade arrives. The film itself is elastic. Typical elongation is 324 percent and tensile strength is 16.2 MPa, with tear strength around 69 N/mm. It bridges cracks instead of snapping when concrete moves.

Polyurea Rayston is aromatic. Sunlight will change the colour. Strength does not follow the colour. An exposed face is finished with an aliphatic polyurethane such as Colodur or Impertrans when appearance matters. A buried planter or the inside of a tank does not need that coat to keep its strength. Root resistance is tested to CEN/TS 14416, which is the whole point beside shrubs and wet soil. Water uptake is very low, about 0.002 kg/m2 per square-root hour. Chemical testing puts the film in class II against 25 percent salt and class III against hydrogen sulphide and 10 percent sulphuric acid. Drinking-water migration tests and a WRAS material approval are on the same datasheet, which matters when a tank holds water people will use. The product carries CE marking to EN 1504-2 and European Technical Assessment 16/0148. Those are assessments of the product, not a measurement taken on this job.

Polyurea Rayston technical data sheet

After the spray, the job is in the details you can no longer see. Outlets must be part of the film, not a ring of mastic added later. Vertical turns need the same thickness as the floor. Soil, water or foot traffic should wait until the hardness has climbed, which for this polyurea is a matter of hours for light contact and days for full cure. An exposed aromatic film wants its aliphatic coat before the first hard summer. A buried one wants its protection board and drainage before the backfill. That is ordinary site discipline, and it is what lets a fast membrane still be there in twenty years.

05 · Results

What does a job like this ask us to stand behind?

Two and a half thousand square metres of pool at a Red Sea hotel is a public test. Guests never see the membrane. They only notice if it fails.

06 · Products

Which products carry this duty?

Polyurea Rayston

Hot-spray pure polyurea. Typical build 1.5 to 2 mm. Elongation 324 percent. Root resistance tested to CEN/TS 14416.

Technical data sheet

07 · FAQ

Frequently asked questions

How fast does the polyurea set?

Polyurea Rayston gels in about 4 seconds at 25 degrees C and is tack-free in seconds. Full hardness still takes days.

Will it bridge a crack?

Typical elongation is 324 percent and tensile strength is 16.2 MPa. The film is meant to stretch with the concrete.

Will it live under pool water?

The membrane is used in tanks and ponds that stay full. Outlets and steps are sprayed in, not left as a joint.

Does sunlight damage it?

Colour can shift because the resin is aromatic. Strength stays. An aliphatic topcoat is added where the film remains in the sun.

What moisture can the concrete have?

Support moisture should be under 4 percent, with concrete between 10 and 40 degrees C. Wetter concrete gets an epoxy primer blinded with quartz.

Talk to our technical team about your project

Tell us the substrate, the water and the exposure.

Contact us