01 · Project overview

What is this project?

Roof waterproofing at a mall in Turin in 2021.

Krypton Chemical manufactures these resin systems in L’Hospitalet de l’Infant, Tarragona.

Are there photos yet? Photos of the works are in the gallery on this page.

Bridge waterproofing, Córdoba A sprayed membrane on a railway deck.

Krypton Chemical supplies the resin system. The duty is ordinary and strict: keep water, wear and weather on the right side of the structure, and do it in the details as well as in the open field.

ProjectRoof waterproofing at a mall in Turin
Year2021

02 · The challenge

What did this structure ask of the system?

A roof is a field of outlets, laps and edges, and the weather works on all of them. Water does not leak through the middle of a sound bay. It gets in where the detail was thin or where the deck has started to move.

Roof waterproofing at a mall in Turin has to be closed as one system, details first, and then left to do its job without a second visit every summer.

Green-coated roof vents and duct on the mall roof in Turin, Italy
Green-coated roof vents and duct on the mall roof in Turin, Italy

03 · The solution

Which system was trusted here?

The system trusted here is the one named for the job. It is chosen because it matches the substrate and the exposure, not because every building wants the same can.

On a roof the membrane has to follow outlets and upstands at the same thickness as the field. An exposed aromatic film takes a topcoat if the colour will be seen.

04 · Application

How is the system built?

The products named for Roof waterproofing at a mall in Turin are applied as one build-up, details before the field. Outlets, edges and changes of plane are closed first, with the same materials as the main area. A system that changes product at the difficult line is a system with a future peel.

The deck is dry, the temperature is inside the range that product allows, and the next coat follows while the window is open. Leaving a detail for the following week is how these jobs come back.

On Roof waterproofing at a mall in Turin the roof fails at the edge long before it fails in the field. Parapets, outlets, plant plinths and laps are detailed first, with the same system, at the same thickness. A bay can be perfect and the ceiling still stains if the outlet was a collar of mastic.

The deck moves between the hot afternoon and the night. The membrane has to move with it. A rigid coat maps every crack in the substrate onto the ceiling. Thermal movement is the reason an elastic system is on a roof like this, not a preference for a particular can.

Where the film stays in the sun, colour and waterproofing are two layers. The membrane keeps the water out. An aliphatic coat keeps the appearance. Skipping the topcoat because the membrane is already waterproof is how a sound roof starts to look failed, and then gets recoated for the wrong reason.

05 · Results

What does a job like this stand behind?

Roof waterproofing at a mall in Turin has one standard. The coating is still doing its job after the building is back in use, at the details as well as in the middle.

Figures for cure, thickness and strength, where they are given, come from the product data sheets. They are not a test cut out of this building.

What this asks of Roof waterproofing at a mall in Turin is workmanship at the difficult line. The open field is the easy part of a resin job. Outlets, edges, penetrations and changes of plane are where thickness goes missing, and where water or wear finds the gap. The same products and the same care belong there, and the cure is allowed to finish before the building goes back into use. That is the difference between a coating that was simply applied and a system that stays in service.

06 · Products

Products on this job

Resin system

The coating system used on this structure. Details follow the product data for the materials applied.

07 · FAQ

Frequently asked questions

Where is this project?

Roof waterproofing at a mall in Turin. the place named on this project

When was the work done?

2021.

What was the duty?

Protect the structure, details included, and leave a film that can stay in service.

Why are the details done first?

Outlets, upstands and joints are where water gets in. They are closed with the same system as the main area.

Are the figures measured on this job?

No. Thickness, elongation and cure times quoted here are the products’ typical data.

08 · Photos

On site

Mall roof waterproofing Turin: coated roof upstand and gutter edge, close view
Mall roof waterproofing Turin: coated roof upstand and gutter edge, close view
Green-coated roof vents and duct on the mall roof in Turin, Italy
Green-coated roof vents and duct on the mall roof in Turin, Italy
Coated roof sections between neighbouring buildings, mall roof in Turin
Coated roof sections between neighbouring buildings, mall roof in Turin
Coated walkway and wall base along the mall roof in Turin, Italy
Coated walkway and wall base along the mall roof in Turin, Italy

Talk to our technical team about your project

Tell us the substrate, the traffic and the exposure.

Contact us

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top