Pharma Factory Flooring in Algeria across Three Zones, 2,400 square metres in 2019. Norte Africa. The products on the job are Pavifloor, EP Coat 100. Norte Africa is the setting, and the exposure is what chooses the build-up.

Project case study Pharma Factory Flooring in Algeria across Three Zones Pharma factory flooring in Algeria covered three zones in one plant.

Rayston Floor PU 30, based on Pavifloor polyurethane, went into production (~2,400 m²) and the lab (~400 m²).

Rayston Floor EP 10 covered the warehouse (~1,100 m²).

Krypton Chemical supplies the resin system. The duty is ordinary and strict: keep water, wear and weather on the right side of the structure, and do it in the details as well as in the open field.

ProjectPharma Factory Flooring in Algeria across Three Zones
PlaceNorte Africa
Area2,400 m²
Year2019
LineFlooring
ProductsPavifloor, EP Coat 100

02 · The challenge

What did this structure ask of the system?

Pharma Factory Flooring in Algeria across Three Zones is a working floor. Wheels, washing water and the daily grit of a building all sit on the same film. A coating that only looks right on the day it is laid will map every crack in the slab within a season.

The concrete has to be opened, not painted over. Laitance, oil and old dust are how resin floors lose their bond, and they lose it in the traffic lines first. Joints and drains are details, not the edge of the job. Across 2,400 square metres, a thin spot is not a small repair.

Crack repair on concrete before coating, Algeria pharma plant
Crack repair on concrete before coating, Algeria pharma plant

03 · The solution

Which system was trusted here?

The system trusted here is the one named for the job: Pavifloor, EP Coat 100. It is chosen because it matches the substrate and the exposure, not because every building wants the same can.

A floor system is a stack. Primer for the bond, body for the thickness, seal for the face. Skipping the primer to save a day is how the floor comes back up on the tyres.

04 · Application

How is the system built?

On this floor the sequence follows the products named for the job: Pavifloor, EP Coat 100. The slab is ground or blasted, the dust is lifted, and cracks are filled before the first resin. A primer is what locks the system into the pores. The body coat takes the wear. The seal is the face people walk on, and it is the layer that has to keep its colour.

Each coat has to be down at the thickness that product is designed for, including at the drains and the joints. A floor that is thick in the middle and starved at the edge will fail at the edge. Traffic waits until the seal has cured. Washing water waits longer than footsteps.

On Pharma Factory Flooring in Algeria across Three Zones the floor is not a decorative coat. It is the surface the building works on. Preparation decides it. Oil, laitance and a closed power-floated face will take a primer for a week and then let it go. The mechanical opening of the pores is part of the system, not a favour the applicator adds if there is time.

Joints move. A resin that is rigid across a joint will crack there, and the crack fills with wash water. The joint is either honoured, with a flexible seal of the right width, or the floor design accepts a cut. Drains are turned into the floor, not left as a ring of mastic after the last coat. Colour goes in the seal coat so a repair later can be matched, and so daylight and cleaning chemicals meet a film that was chosen for that, not the structural coat underneath.

Cure is part of the programme. Foot traffic, pallet trucks and the first wash are three different dates. Opening a floor early because the building is in a hurry is how a good system gets a bad name. The data sheet of each named product sets those dates. This page does not invent a shorter one for the sake of the story.

05 · Results

What does a job like this stand behind?

Pharma Factory Flooring in Algeria across Three Zones has one standard. The coating is still doing its job after the building is back in use, at the details as well as in the middle. The area on this job is 2,400 square metres.

Figures for cure, thickness and strength, where they are given, come from the product data sheets. They are not a test cut out of this building.

What this asks of Pharma Factory Flooring in Algeria across Three Zones is workmanship at the difficult line. The open field is the easy part of a resin job. Outlets, edges, penetrations and changes of plane are where thickness goes missing, and where water or wear finds the gap. The same products and the same care belong there, and the cure is allowed to finish before the building goes back into use. That is the difference between a coating that was simply applied and a system that stays in service.

06 · Products

Products on this job

Pavifloor

Named on this project. The data sheet carries the application window and the typical figures.

EP Coat 100

Named on this project. The data sheet carries the application window and the typical figures.

07 · FAQ

Frequently asked questions

Where is this project?

Pharma Factory Flooring in Algeria across Three Zones. Norte Africa

When was the work done?

2019.

Which products were used?

Pavifloor, EP Coat 100.

Why does the concrete preparation matter?

Resin sticks to a clean, open slab. It does not stick to laitance or oil. The bond fails in the wheel tracks first.

When can the floor take traffic?

Foot traffic waits until the seal has cured. Wheels and wash-down wait longer. The exact window is the one in each product’s data sheet.

08 · Photos

On site

Pharma factory flooring Algeria - glossy blue production floor
Pharma factory flooring Algeria – glossy blue production floor
Crack repair on concrete before coating, Algeria pharma plant
Crack repair on concrete before coating, Algeria pharma plant
Blue polyurethane floor across the production hall, Algeria pharma plant
Blue polyurethane floor across the production hall, Algeria pharma plant
Glossy blue production floor after coating, Algeria pharma plant
Glossy blue production floor after coating, Algeria pharma plant
Wide reflective blue self-levelling polyurethane floor, Algeria pharma plant
Wide reflective blue self-levelling polyurethane floor, Algeria pharma plant
Bare concrete production hall before flooring, Algeria pharma plant
Bare concrete production hall before flooring, Algeria pharma plant
Filled joints across the ground concrete slab, Algeria pharma plant
Filled joints across the ground concrete slab, Algeria pharma plant
Blue resin floor meeting uncoated concrete in the hall, Algeria pharma plant
Blue resin floor meeting uncoated concrete in the hall, Algeria pharma plant
Glossy blue floor edge beside bare concrete, Algeria pharma plant
Glossy blue floor edge beside bare concrete, Algeria pharma plant
Prepared concrete beside a finished blue bay, Algeria pharma plant
Prepared concrete beside a finished blue bay, Algeria pharma plant
Glossy blue floor reflecting the hall windows, Algeria pharma plant
Glossy blue floor reflecting the hall windows, Algeria pharma plant
Wide glossy dark blue floor across the hall, Algeria pharma plant
Wide glossy dark blue floor across the hall, Algeria pharma plant
Dark blue glossy floor running toward the windows, Algeria pharma plant
Dark blue glossy floor running toward the windows, Algeria pharma plant
Grey textured mezzanine floor behind red railings, Algeria pharma plant
Grey textured mezzanine floor behind red railings, Algeria pharma plant
Grey textured floor in the upper hall, Algeria pharma plant
Grey textured floor in the upper hall, Algeria pharma plant
Textured mezzanine floor seen through red railings, Algeria pharma plant
Textured mezzanine floor seen through red railings, Algeria pharma plant
Close view of the grey textured floor surface, Algeria pharma plant
Close view of the grey textured floor surface, Algeria pharma plant
Blue floor under the hall lights, Algeria pharma plant
Blue floor under the hall lights, Algeria pharma plant
Blue floor under the hall lights, second view, Algeria pharma plant
Blue floor under the hall lights, second view, Algeria pharma plant
Primed slab with copper tape leading to a blue floor area, Algeria pharma plant
Primed slab with copper tape leading to a blue floor area, Algeria pharma plant
Light blue glossy floor near the loading doors, Algeria pharma plant
Light blue glossy floor near the loading doors, Algeria pharma plant
Copper tape grid on the primed slab of the conductive bay, Algeria pharma plant
Copper tape grid on the primed slab of the conductive bay, Algeria pharma plant
Copper tape and filled joints beside stored crates, Algeria pharma plant
Copper tape and filled joints beside stored crates, Algeria pharma plant
Close-up of copper tape crossing filled joints, Algeria pharma plant
Close-up of copper tape crossing filled joints, Algeria pharma plant
Prepared concrete joints in the warehouse, Algeria pharma plant
Prepared concrete joints in the warehouse, Algeria pharma plant

Talk to our technical team about your project

Tell us the substrate, the traffic and the exposure.

Contact us

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top