01 · Project overview

What is this project?

Petrol Station Flooring in Madrid in 2023. España – Madrid. The products on the job are Kryptanate 100 LV. Madrid gives a coating a hard light and a wide year, hot pavements in summer and frost on steel by winter.

Frames that carried a graphic stamp were left out.

What was the constraint? A petrol station cannot stay closed for a long cure.

Products named on this job Kryptanate 100 LV Role here: The forecourt coat.

Krypton Chemical supplies the resin system. The duty is ordinary and strict: keep water, wear and weather on the right side of the structure, and do it in the details as well as in the open field.

ProjectPetrol Station Flooring in Madrid
PlaceEspaña – Madrid
Year2023
LineFlooring
ProductsKryptanate 100 LV

02 · The challenge

What did this structure ask of the system?

Petrol Station Flooring in Madrid is a working floor. Wheels, washing water and the daily grit of a building all sit on the same film. A coating that only looks right on the day it is laid will map every crack in the slab within a season.

The concrete has to be opened, not painted over. Laitance, oil and old dust are how resin floors lose their bond, and they lose it in the traffic lines first. Joints and drains are details, not the edge of the job.

A worker with a roller on the red forecourt
A worker with a roller on the red forecourt

03 · The solution

Which system was trusted here?

The system trusted here is the one named for the job: Kryptanate 100 LV. It is chosen because it matches the substrate and the exposure, not because every building wants the same can.

A floor system is a stack. Primer for the bond, body for the thickness, seal for the face. Skipping the primer to save a day is how the floor comes back up on the tyres.

04 · Application

How is the system built?

On this floor the sequence follows the products named for the job: Kryptanate 100 LV. The slab is ground or blasted, the dust is lifted, and cracks are filled before the first resin. A primer is what locks the system into the pores. The body coat takes the wear. The seal is the face people walk on, and it is the layer that has to keep its colour.

Each coat has to be down at the thickness that product is designed for, including at the drains and the joints. A floor that is thick in the middle and starved at the edge will fail at the edge. Traffic waits until the seal has cured. Washing water waits longer than footsteps.

On Petrol Station Flooring in Madrid the floor is not a decorative coat. It is the surface the building works on. Preparation decides it. Oil, laitance and a closed power-floated face will take a primer for a week and then let it go. The mechanical opening of the pores is part of the system, not a favour the applicator adds if there is time.

Joints move. A resin that is rigid across a joint will crack there, and the crack fills with wash water. The joint is either honoured, with a flexible seal of the right width, or the floor design accepts a cut. Drains are turned into the floor, not left as a ring of mastic after the last coat. Colour goes in the seal coat so a repair later can be matched, and so daylight and cleaning chemicals meet a film that was chosen for that, not the structural coat underneath.

Cure is part of the programme. Foot traffic, pallet trucks and the first wash are three different dates. Opening a floor early because the building is in a hurry is how a good system gets a bad name. The data sheet of each named product sets those dates. This page does not invent a shorter one for the sake of the story.

05 · Results

What does a job like this stand behind?

Petrol Station Flooring in Madrid has one standard. The coating is still doing its job after the building is back in use, at the details as well as in the middle.

Figures for cure, thickness and strength, where they are given, come from the product data sheets. They are not a test cut out of this building.

What this asks of Petrol Station Flooring in Madrid is workmanship at the difficult line. The open field is the easy part of a resin job. Outlets, edges, penetrations and changes of plane are where thickness goes missing, and where water or wear finds the gap. The same products and the same care belong there, and the cure is allowed to finish before the building goes back into use. That is the difference between a coating that was simply applied and a system that stays in service.

06 · Products

Products on this job

Kryptanate 100 LV

Named on this project. The data sheet carries the application window and the typical figures.

07 · FAQ

Frequently asked questions

Where is this project?

Petrol Station Flooring in Madrid. España – Madrid

When was the work done?

2023.

Which products were used?

Kryptanate 100 LV.

Why does the concrete preparation matter?

Resin sticks to a clean, open slab. It does not stick to laitance or oil. The bond fails in the wheel tracks first.

When can the floor take traffic?

Foot traffic waits until the seal has cured. Wheels and wash-down wait longer. The exact window is the one in each product’s data sheet.

08 · Photos

On site

Red forecourt under a petrol-station canopy in Madrid
Red forecourt under a petrol-station canopy in Madrid
A worker with a roller on the red forecourt
A worker with a roller on the red forecourt
The red forecourt under the station canopy
The red forecourt under the station canopy
Cars at the pumps on the new red floor
Cars at the pumps on the new red floor
A resin drum beside the pumps on the red floor
A resin drum beside the pumps on the red floor

Talk to our technical team about your project

Tell us the substrate, the traffic and the exposure.

Contact us
Scroll to Top