01 · Project overview

What is this project?

Industrial Kitchen Flooring Germany: Rayston Floor PU 30, 1,500 square metres in 2024. The products on the job are Colodur, Epoxy 100, Pavifloor.

The system is Rayston Floor PU 30 : an epoxy primer, self-levelling Pavifloor and a Colodur Eco seal.

It also had to run through long service corridors, around columns and under pipe supports.

Long corridor after the works Floor under the pipe supports 03 · Solution Why was Rayston Floor PU 30 chosen? The project note names Rayston Floor PU 30, a three-layer polyurethane system.

Krypton Chemical supplies the resin system. The duty is ordinary and strict: keep water, wear and weather on the right side of the structure, and do it in the details as well as in the open field.

ProjectIndustrial Kitchen Flooring Germany: Rayston Floor PU 30
Area1,500 m²
Year2024
ProductsColodur, Epoxy 100, Pavifloor

02 · The challenge

What did this structure ask of the system?

Industrial Kitchen Flooring Germany: Rayston Floor PU 30 is a working floor. Wheels, washing water and the daily grit of a building all sit on the same film. A coating that only looks right on the day it is laid will map every crack in the slab within a season.

The concrete has to be opened, not painted over. Laitance, oil and old dust are how resin floors lose their bond, and they lose it in the traffic lines first. Joints and drains are details, not the edge of the job. Across 1,500 square metres, a thin spot is not a small repair.

Industrial kitchen flooring Germany: long corridor with the new polyurethane floor
Industrial kitchen flooring Germany: long corridor with the new polyurethane floor

03 · The solution

Which system was trusted here?

The system trusted here is the one named for the job: Colodur, Epoxy 100, Pavifloor. It is chosen because it matches the substrate and the exposure, not because every building wants the same can.

A floor system is a stack. Primer for the bond, body for the thickness, seal for the face. Skipping the primer to save a day is how the floor comes back up on the tyres.

04 · Application

How is the system built?

On this floor the sequence follows the products named for the job: Colodur, Epoxy 100, Pavifloor. The slab is ground or blasted, the dust is lifted, and cracks are filled before the first resin. A primer is what locks the system into the pores. The body coat takes the wear. The seal is the face people walk on, and it is the layer that has to keep its colour.

Each coat has to be down at the thickness that product is designed for, including at the drains and the joints. A floor that is thick in the middle and starved at the edge will fail at the edge. Traffic waits until the seal has cured. Washing water waits longer than footsteps.

On Industrial Kitchen Flooring Germany: Rayston Floor PU 30 the floor is not a decorative coat. It is the surface the building works on. Preparation decides it. Oil, laitance and a closed power-floated face will take a primer for a week and then let it go. The mechanical opening of the pores is part of the system, not a favour the applicator adds if there is time.

Joints move. A resin that is rigid across a joint will crack there, and the crack fills with wash water. The joint is either honoured, with a flexible seal of the right width, or the floor design accepts a cut. Drains are turned into the floor, not left as a ring of mastic after the last coat. Colour goes in the seal coat so a repair later can be matched, and so daylight and cleaning chemicals meet a film that was chosen for that, not the structural coat underneath.

Cure is part of the programme. Foot traffic, pallet trucks and the first wash are three different dates. Opening a floor early because the building is in a hurry is how a good system gets a bad name. The data sheet of each named product sets those dates. This page does not invent a shorter one for the sake of the story.

05 · Results

What does a job like this stand behind?

Industrial Kitchen Flooring Germany: Rayston Floor PU 30 has one standard. The coating is still doing its job after the building is back in use, at the details as well as in the middle. The area on this job is 1,500 square metres.

Figures for cure, thickness and strength, where they are given, come from the product data sheets. They are not a test cut out of this building.

What this asks of Industrial Kitchen Flooring Germany: Rayston Floor PU 30 is workmanship at the difficult line. The open field is the easy part of a resin job. Outlets, edges, penetrations and changes of plane are where thickness goes missing, and where water or wear finds the gap. The same products and the same care belong there, and the cure is allowed to finish before the building goes back into use. That is the difference between a coating that was simply applied and a system that stays in service.

06 · Products

Products on this job

Colodur

Named on this project. The data sheet carries the application window and the typical figures.

Technical data sheet

Epoxy 100

Named on this project. The data sheet carries the application window and the typical figures.

Pavifloor

Named on this project. The data sheet carries the application window and the typical figures.

07 · FAQ

Frequently asked questions

Where is this project?

Industrial Kitchen Flooring Germany: Rayston Floor PU 30. the place named on this project

When was the work done?

2024.

Which products were used?

Colodur, Epoxy 100, Pavifloor.

Why does the concrete preparation matter?

Resin sticks to a clean, open slab. It does not stick to laitance or oil. The bond fails in the wheel tracks first.

When can the floor take traffic?

Foot traffic waits until the seal has cured. Wheels and wash-down wait longer. The exact window is the one in each product’s data sheet.

08 · Photos

On site

Industrial kitchen flooring Germany: glossy grey Rayston Floor PU 30 floor in a service corridor
Industrial kitchen flooring Germany: glossy grey Rayston Floor PU 30 floor in a service corridor
Industrial kitchen flooring Germany: long corridor with the new polyurethane floor
Industrial kitchen flooring Germany: long corridor with the new polyurethane floor
Polyurethane floor running under pipe supports in an industrial kitchen, Germany
Polyurethane floor running under pipe supports in an industrial kitchen, Germany
Light reflecting on the sealed Colodur Eco surface of the kitchen floor
Light reflecting on the sealed Colodur Eco surface of the kitchen floor
Open floor area with a glossy grey polyurethane finish in an industrial kitchen
Open floor area with a glossy grey polyurethane finish in an industrial kitchen
Glossy floor around columns and ducts in an industrial kitchen in Germany
Glossy floor around columns and ducts in an industrial kitchen in Germany

Talk to our technical team about your project

Tell us the substrate, the traffic and the exposure.

Contact us

Leave a Comment

Your email address will not be published. Required fields are marked *