01 · Project overview

What is this project?

In 2023, Ibiza wastewater plant was made with Rayston Spray D50. The Balearic sun and the salt in the air are the two things a finish has to live with, every season.

This one is a wastewater plant.

Krypton Chemical makes the resin. The crew on site applies it. On Ibiza wastewater plant the details have to get the same film as the open field, and the cure has to finish before the building goes back to work.

ProjectIbiza wastewater plant
PlaceEspaña – Baleares
Year2023
LineWaterproofing
ProductsRayston Spray D50

02 · The challenge

What did this structure ask of the system?

A treatment plant is wet, chemical and never really empty. Channels and tanks take abrasion from grit and attack from the water they carry.

Ibiza wastewater plant needs a lining that turns the corners and stays bonded when the basin is full. A joint left in the invert is the first place it opens.

03 · The solution

Which system was trusted here?

The system trusted here is the one named for the job: Rayston Spray D50. It is chosen because it matches the substrate and the exposure, not because every building wants the same can.

On a roof the membrane has to follow outlets and upstands at the same thickness as the field. An exposed aromatic film takes a topcoat if the colour will be seen.

04 · Application

How is the system built?

The products named for Ibiza wastewater plant are applied as one build-up, details before the field. Outlets, edges and changes of plane are closed first, with the same materials as the main area. A system that changes product at the difficult line is a system with a future peel.

The line is Rayston Spray D50. The deck is dry, the temperature is inside the range that product allows, and the next coat follows while the window is open. Leaving a detail for the following week is how these jobs come back.

On Ibiza wastewater plant the roof fails at the edge long before it fails in the field. Parapets, outlets, plant plinths and laps are detailed first, with the same system, at the same thickness. A bay can be perfect and the ceiling still stains if the outlet was a collar of mastic.

The deck moves between the hot afternoon and the night. The membrane has to move with it. A rigid coat maps every crack in the substrate onto the ceiling. Thermal movement is the reason an elastic system is on a roof like this, not a preference for a particular can.

Where the film stays in the sun, colour and waterproofing are two layers. The membrane keeps the water out. An aliphatic coat keeps the appearance. Skipping the topcoat because the membrane is already waterproof is how a sound roof starts to look failed, and then gets recoated for the wrong reason.

05 · Results

What does a job like this stand behind?

Ibiza wastewater plant has one standard. The coating is still doing its job after the building is back in use, at the details as well as in the middle.

Figures for cure, thickness and strength, where they are given, come from the product data sheets. They are not a test cut out of this building.

What this asks of Ibiza wastewater plant is workmanship at the difficult line. The open field is the easy part of a resin job. Outlets, edges, penetrations and changes of plane are where thickness goes missing, and where water or wear finds the gap. The same products and the same care belong there, and the cure is allowed to finish before the building goes back into use. That is the difference between a coating that was simply applied and a system that stays in service.

06 · Products

Products on this job

Rayston Spray D50

Named on this project. The data sheet carries the application window and the typical figures.

07 · FAQ

Frequently asked questions

Where is this project?

Ibiza wastewater plant. España – Baleares

When was the work done?

2023.

Which products were used?

Rayston Spray D50.

Why are the details done first?

Outlets, upstands and joints are where water gets in. They are closed with the same system as the main area.

Where do the cure times come from?

From the product data sheet. They describe the resin, not a clock stopped on this site.

The programme does not change because the building is smaller or further away. Prepare the substrate until it will hold the system, close the details before the field, and keep the thickness honest at every edge. A second visit to repair a starved detail costs more than doing that detail on the first day. Ibiza wastewater plant is held to that standard. Krypton Chemical supplies the resin. The applicator owns the surface.

Talk to our technical team about your project

Tell us the substrate, the traffic and the exposure.

Contact us

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top