01 · Project overview

What is this project?

Drinks Warehouse Floor Coating in Ukraine with EP Coat 100, 320 square metres in 2023. Europa Este. The products on the job are EP Coat 100. Europa Este is the setting, and the exposure is what chooses the build-up.

Our partner, SUHOFF Groundwork Contractors, used the Rayston Floor EP 10 system.

Firstly, they primed the slab with Rayston Epoxy 100.

Then two coats of EP Coat 100 in RAL 7001 grey closed it.

Krypton Chemical supplies the resin system. The duty is ordinary and strict: keep water, wear and weather on the right side of the structure, and do it in the details as well as in the open field.

ProjectDrinks Warehouse Floor Coating in Ukraine with EP Coat 100
PlaceEuropa Este
Area320 m²
Year2023
LineFlooring
ProductsEP Coat 100

02 · The challenge

What did this structure ask of the system?

Drinks Warehouse Floor Coating in Ukraine with EP Coat 100 is a working floor. Wheels, washing water and the daily grit of a building all sit on the same film. A coating that only looks right on the day it is laid will map every crack in the slab within a season.

The concrete has to be opened, not painted over. Laitance, oil and old dust are how resin floors lose their bond, and they lose it in the traffic lines first. Joints and drains are details, not the edge of the job. Across 320 square metres, a thin spot is not a small repair.

Cracked and worn concrete slab before the works, warehouse in Ukraine
Cracked and worn concrete slab before the works, warehouse in Ukraine

03 · The solution

Which system was trusted here?

The system trusted here is the one named for the job: EP Coat 100. It is chosen because it matches the substrate and the exposure, not because every building wants the same can.

A floor system is a stack. Primer for the bond, body for the thickness, seal for the face. Skipping the primer to save a day is how the floor comes back up on the tyres.

04 · Application

How is the system built?

On this floor the sequence follows the products named for the job: EP Coat 100. The slab is ground or blasted, the dust is lifted, and cracks are filled before the first resin. A primer is what locks the system into the pores. The body coat takes the wear. The seal is the face people walk on, and it is the layer that has to keep its colour.

Each coat has to be down at the thickness that product is designed for, including at the drains and the joints. A floor that is thick in the middle and starved at the edge will fail at the edge. Traffic waits until the seal has cured. Washing water waits longer than footsteps.

On Drinks Warehouse Floor Coating in Ukraine with EP Coat 100 the floor is not a decorative coat. It is the surface the building works on. Preparation decides it. Oil, laitance and a closed power-floated face will take a primer for a week and then let it go. The mechanical opening of the pores is part of the system, not a favour the applicator adds if there is time.

Joints move. A resin that is rigid across a joint will crack there, and the crack fills with wash water. The joint is either honoured, with a flexible seal of the right width, or the floor design accepts a cut. Drains are turned into the floor, not left as a ring of mastic after the last coat. Colour goes in the seal coat so a repair later can be matched, and so daylight and cleaning chemicals meet a film that was chosen for that, not the structural coat underneath.

Cure is part of the programme. Foot traffic, pallet trucks and the first wash are three different dates. Opening a floor early because the building is in a hurry is how a good system gets a bad name. The data sheet of each named product sets those dates. This page does not invent a shorter one for the sake of the story.

05 · Results

What does a job like this stand behind?

Drinks Warehouse Floor Coating in Ukraine with EP Coat 100 has one standard. The coating is still doing its job after the building is back in use, at the details as well as in the middle. The area on this job is 320 square metres.

Figures for cure, thickness and strength, where they are given, come from the product data sheets. They are not a test cut out of this building.

What this asks of Drinks Warehouse Floor Coating in Ukraine with EP Coat 100 is workmanship at the difficult line. The open field is the easy part of a resin job. Outlets, edges, penetrations and changes of plane are where thickness goes missing, and where water or wear finds the gap. The same products and the same care belong there, and the cure is allowed to finish before the building goes back into use. That is the difference between a coating that was simply applied and a system that stays in service.

06 · Products

Products on this job

EP Coat 100

Named on this project. The data sheet carries the application window and the typical figures.

07 · FAQ

Frequently asked questions

Where is this project?

Drinks Warehouse Floor Coating in Ukraine with EP Coat 100. Europa Este

When was the work done?

2023.

Which products were used?

EP Coat 100.

Why does the concrete preparation matter?

Resin sticks to a clean, open slab. It does not stick to laitance or oil. The bond fails in the wheel tracks first.

When can the floor take traffic?

Foot traffic waits until the seal has cured. Wheels and wash-down wait longer. The exact window is the one in each product’s data sheet.

08 · Photos

On site

Drinks warehouse floor coating in Ukraine: grey floor across the hall in sunlight
Drinks warehouse floor coating in Ukraine: grey floor across the hall in sunlight
Cracked and worn concrete slab before the works, warehouse in Ukraine
Cracked and worn concrete slab before the works, warehouse in Ukraine
Grey epoxy floor along the side wall, drinks warehouse in Ukraine
Grey epoxy floor along the side wall, drinks warehouse in Ukraine
Old slab with a broom and tools by the wall, drinks warehouse in Ukraine
Old slab with a broom and tools by the wall, drinks warehouse in Ukraine
Wide view of the new grey floor under the timber roof, Ukraine
Wide view of the new grey floor under the timber roof, Ukraine
Stained slab running toward the warehouse wall
Stained slab running toward the warehouse wall
Reflections along the centre of the finished floor
Reflections along the centre of the finished floor
Long view of the coated warehouse floor and timber roof
Long view of the coated warehouse floor and timber roof

Talk to our technical team about your project

Tell us the substrate, the traffic and the exposure.

Contact us

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top