01 · Project overview

What is this project?

Decorative Resin Flooring for a Leisure Venue in Salou, 560 square metres in 2022. España – Cataluña. The products on the job are Pavisoft, Matt de caucho. Catalonia works a roof and a floor hard: sea air on the coast, a sharp swing between afternoon and night, and industrial towns that do not stop for a slow coating.

In October 2021, the crew covered about 560 m² with Rayston Floor PU 30 Comfort.

A 4 mm rubber mat sits under a Pavisoft polyurethane layer.

So the floor had to look striking and feel comfortable underfoot.

Krypton Chemical supplies the resin system. The duty is ordinary and strict: keep water, wear and weather on the right side of the structure, and do it in the details as well as in the open field.

ProjectDecorative Resin Flooring for a Leisure Venue in Salou
PlaceEspaña – Cataluña
Area560 m²
Year2022
LineWaterproofing
ProductsPavisoft, Matt de caucho

02 · The challenge

What did this structure ask of the system?

Decorative Resin Flooring for a Leisure Venue in Salou is a working floor. Wheels, washing water and the daily grit of a building all sit on the same film. A coating that only looks right on the day it is laid will map every crack in the slab within a season.

The concrete has to be opened, not painted over. Laitance, oil and old dust are how resin floors lose their bond, and they lose it in the traffic lines first. Joints and drains are details, not the edge of the job. Across 560 square metres, a thin spot is not a small repair.

Venue hall with dark substrate and hexagon panels before flooring, Salou
Venue hall with dark substrate and hexagon panels before flooring, Salou

03 · The solution

Which system was trusted here?

The system trusted here is the one named for the job: Pavisoft, Matt de caucho. It is chosen because it matches the substrate and the exposure, not because every building wants the same can.

A floor system is a stack. Primer for the bond, body for the thickness, seal for the face. Skipping the primer to save a day is how the floor comes back up on the tyres.

04 · Application

How is the system built?

On this floor the sequence follows the products named for the job: Pavisoft, Matt de caucho. The slab is ground or blasted, the dust is lifted, and cracks are filled before the first resin. A primer is what locks the system into the pores. The body coat takes the wear. The seal is the face people walk on, and it is the layer that has to keep its colour.

Each coat has to be down at the thickness that product is designed for, including at the drains and the joints. A floor that is thick in the middle and starved at the edge will fail at the edge. Traffic waits until the seal has cured. Washing water waits longer than footsteps.

On Decorative Resin Flooring for a Leisure Venue in Salou the floor is not a decorative coat. It is the surface the building works on. Preparation decides it. Oil, laitance and a closed power-floated face will take a primer for a week and then let it go. The mechanical opening of the pores is part of the system, not a favour the applicator adds if there is time.

Joints move. A resin that is rigid across a joint will crack there, and the crack fills with wash water. The joint is either honoured, with a flexible seal of the right width, or the floor design accepts a cut. Drains are turned into the floor, not left as a ring of mastic after the last coat. Colour goes in the seal coat so a repair later can be matched, and so daylight and cleaning chemicals meet a film that was chosen for that, not the structural coat underneath.

Cure is part of the programme. Foot traffic, pallet trucks and the first wash are three different dates. Opening a floor early because the building is in a hurry is how a good system gets a bad name. The data sheet of each named product sets those dates. This page does not invent a shorter one for the sake of the story.

05 · Results

What does a job like this stand behind?

Decorative Resin Flooring for a Leisure Venue in Salou has one standard. The coating is still doing its job after the building is back in use, at the details as well as in the middle. The area on this job is 560 square metres.

Figures for cure, thickness and strength, where they are given, come from the product data sheets. They are not a test cut out of this building.

What this asks of Decorative Resin Flooring for a Leisure Venue in Salou is workmanship at the difficult line. The open field is the easy part of a resin job. Outlets, edges, penetrations and changes of plane are where thickness goes missing, and where water or wear finds the gap. The same products and the same care belong there, and the cure is allowed to finish before the building goes back into use. That is the difference between a coating that was simply applied and a system that stays in service.

06 · Products

Products on this job

Pavisoft

Named on this project. The data sheet carries the application window and the typical figures.

Matt de caucho

Named on this project. The data sheet carries the application window and the typical figures.

07 · FAQ

Frequently asked questions

Where is this project?

Decorative Resin Flooring for a Leisure Venue in Salou. España – Cataluña

When was the work done?

2022.

Which products were used?

Pavisoft, Matt de caucho.

Why does the concrete preparation matter?

Resin sticks to a clean, open slab. It does not stick to laitance or oil. The bond fails in the wheel tracks first.

When can the floor take traffic?

Foot traffic waits until the seal has cured. Wheels and wash-down wait longer. The exact window is the one in each product’s data sheet.

08 · Photos

On site

Decorative resin flooring in Salou: grey floor with white vein pattern
Decorative resin flooring in Salou: grey floor with white vein pattern
Venue hall with dark substrate and hexagon panels before flooring, Salou
Venue hall with dark substrate and hexagon panels before flooring, Salou
Rubber mat joint detail at a board edge, Salou
Rubber mat joint detail at a board edge, Salou
Applicator detailing the floor edge by hand, Salou
Applicator detailing the floor edge by hand, Salou
Grey decorative resin floor with white vein lines, Salou
Grey decorative resin floor with white vein lines, Salou
Rubber mat panels being laid in the venue hall, Salou
Rubber mat panels being laid in the venue hall, Salou
Glossy decorative floor with a worker in safety boots, Salou
Glossy decorative floor with a worker in safety boots, Salou
Rubber mat layout across the multipurpose hall, Salou
Rubber mat layout across the multipurpose hall, Salou
Rubber mat and pale hexagon panels on the floor, Salou
Rubber mat and pale hexagon panels on the floor, Salou
Hall floor with rubber mat installed under the bar fit-out, Salou
Hall floor with rubber mat installed under the bar fit-out, Salou
Close view of the 4 mm rubber mat surface, Salou
Close view of the 4 mm rubber mat surface, Salou
Worker rolling the rubber mat into the adhesive, Salou
Worker rolling the rubber mat into the adhesive, Salou
Hexagon panels set into the floor build-up, Salou
Hexagon panels set into the floor build-up, Salou
Floor panels by the tiered seating during works, Salou
Floor panels by the tiered seating during works, Salou
Rubber mat in front of the seating area, Salou
Rubber mat in front of the seating area, Salou
Wide view of the hall floor during works, Salou
Wide view of the hall floor during works, Salou
Rubber mat running under the curved bar, Salou
Rubber mat running under the curved bar, Salou
Hall floor under the suspended ceiling during works, Salou
Hall floor under the suspended ceiling during works, Salou
Glossy decorative floor with a worker in a hi-vis jacket, Salou
Glossy decorative floor with a worker in a hi-vis jacket, Salou
Wide view of the grey veined decorative resin floor, Salou
Wide view of the grey veined decorative resin floor, Salou

Talk to our technical team about your project

Tell us the substrate, the traffic and the exposure.

Contact us