Project case study

Bricorama Depot Roofs, France

The Bricorama depots at Epernay and at Voisins-le-Bretonneux were waterproofed and refurbished with Impermax.

01

Overview

The Bricorama depots at Epernay and at Voisins-le-Bretonneux were waterproofed and refurbished with Impermax.

Places: Epernay and Voisins-le-Bretonneux, FranceSites: Bricorama depotsWork: Roof waterproofing and refurbishmentMembrane: Impermax
PlacesEpernay and Voisins-le-Bretonneux, France
SitesBricorama depots
WorkRoof waterproofing and refurbishment
MembraneImpermax
02

Challenge

Two depots, two towns, one system. Epernay and Voisins-le-Bretonneux are far enough apart that the weather is not identical, and close enough in duty that the roof is the same problem: keep a retail warehouse dry. Stock does not care which town the drip came from.

Both roofs are Impermax refurbishments. The same build in both towns means the same inspection: colour, upstands and outlets.

03

Solution

Impermax is Krypton Chemical’s cold-applied liquid polyurethane membrane. It goes on by roller, brush, spreader or airless equipment, in two coats of about 1 kg per square metre each. The coats are different colours, so a missed patch shows while the work is still open. A spiked roller is run while the coat is wet, to break bubbles before they set. A mesh is not required across the field. It is used at edges and corners, the places a liquid film is asked to turn.

Elongation is 450 to 600 percent and tensile strength is 2.5 to 4.3 MPa. Those figures are typical product data, measured on the product under stated conditions. They are not a cut taken from this job. On a surface that moves with heat, that elongation is why the film can stay with the substrate instead of cracking where the plane changes.

The substrate wants to be between 5 and 40 degrees C. Above 45 degrees C the work needs extra measures. Pot life is about 4 to 6 hours for 1 kg at 20 degrees C and 50 percent relative humidity. People can usually walk the film in one or two days. It reaches about 90 percent of its properties in three days. Final hardness takes 10 to 15 days, and standing water should wait for that. The European Technical Assessment is 06/0263, with CE marking for the 10-year and 25-year working-life categories. The system also carries a BBA agrément.

The same two-coat build on both roofs means a missed upstand looks the same in either town. The colour change between coats is the inspection, and it does not depend on which crew is on which roof. Cold application keeps a torch off a warehouse that is full of stock.

04

Application

Stir the pail slowly so settled solids come back and bubbles can leave. Do not thin it with a solvent that is not the Rayston PU solvent. The surface is cleaned, cracks and weak spots are dealt with first, then the two coats go down, including upstands and outlets in the same passes. Details are not left for a leftover tin at the end of the day.

On this job the same rule applies at every edge. a warehouse roof leaks onto stock, and both depots needed the same film rather than two different patch methods. A holiday in the second coat is a path. The colour change is how that path is seen before the surface is handed back. Outlets, upstands and fixings take the same two coats as the field, because water does not fail in the middle of a bay. It fails where the plane changes.

05

Results

Both Bricorama depot roofs, at Epernay and at Voisins-le-Bretonneux, are refurbished in Impermax, details included.

06

Products

Impermax

Cold-applied liquid polyurethane. Two coats at about 1 kg per square metre each. Elongation 450 to 600 percent. Those figures are typical product data.

Impermax technical data sheet

07

FAQ

How is Impermax applied?

By roller, brush, spreader or airless equipment, in two coats of about 1 kg per square metre each. The coats are different colours so a holiday shows. On these two roofs that matters because a warehouse roof leaks onto stock, and both depots needed the same film rather than two different patch methods.

How long before the film can be walked?

Usually one or two days. About 90 percent of the properties are there in three days. Final hardness takes 10 to 15 days, and standing water should wait for that. On these two roofs a film that is walked or flooded early is still soft.

What temperature does the substrate need?

Between 5 and 40 degrees C. Above 45 degrees C the work needs extra measures. A surface in full sun can pass that even when the air feels moderate, and these two roofs is no exception.

What do the strength figures mean here?

Elongation is 450 to 600 percent and tensile strength is 2.5 to 4.3 MPa. Those are typical product data, not a test cut from this job. They are why the film can follow movement at upstands and outlets on these two roofs.

Where do the cure times come from?

From the Impermax technical data sheet, measured on the product under stated conditions. They are not a stopwatch reading from these two roofs. The ETA for the system is 06/0263.

Talk to our technical team about your project

Send the area, the substrate and a few site notes when you have them.

Contact us

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top