Torremolinos: Pool waterproofing
In 2019, the pool waterproofing at Torremolinos was made with Rayston Spray D50, Paintchlore 2K.
01 · Project overview
What is this project?
In 2019, the pool waterproofing at Torremolinos was made with Rayston Spray D50, Paintchlore 2K. Andalusia’s sun is long and direct. A film left bare will show it, even when the waterproofing underneath is still sound.
This one is pool waterproofing.
Krypton Chemical makes the resin. The crew on site applies it. On Torremolinos the details have to get the same film as the open field, and the cure has to finish before the building goes back to work.
| Project | Torremolinos: Pool waterproofing |
|---|---|
| Place | España – Andalucia |
| Year | 2019 |
| Line | Waterproofing |
| Products | Rayston Spray D50, Paintchlore 2K |
02 · The challenge
What did this structure ask of the system?
A pool stays full. Chlorine, warm water and the step edge all sit on one lining. The open floor is the easy part. The skimmer, the outlet and the floor-to-wall corner are where linings open.
Torremolinos: Pool waterproofing has to turn those corners in the same film, and it should not be filled early.
03 · The solution
Which system was trusted here?
The system trusted here is the one named for the job: Rayston Spray D50, Paintchlore 2K. It is chosen because it matches the substrate and the exposure, not because every building wants the same can.
The build-up is there to survive the exposure this structure actually has, including the lines where workmanship usually goes thin.
04 · Application
How is the system built?
The products named for Torremolinos: Pool waterproofing are applied as one build-up, details before the field. Outlets, edges and changes of plane are closed first, with the same materials as the main area. A system that changes product at the difficult line is a system with a future peel.
The line is Rayston Spray D50, Paintchlore 2K. The deck is dry, the temperature is inside the range that product allows, and the next coat follows while the window is open. Leaving a detail for the following week is how these jobs come back.
On Torremolinos: Pool waterproofing the lining is under water for months at a time. Steps, skimmers and the floor-to-wall corner take the movement and the chlorine together. A joint left in one of those lines will open. The film has to turn the corner at the same build as the floor.
Old tile, where that is the substrate, is a special case. The glaze is a closed face. It is prepared until the resin has something to hold, and every loose tile is out before the primer. Encapsulating a drummy tile is how the lining comes back up in the first season.
Filling waits until the cure the product asks for, not until the pool looks finished. Early water is a soft film and a blister. The outlets are sprayed or rolled into the same film, not collared afterwards.
05 · Results
What does a job like this stand behind?
Torremolinos: Pool waterproofing has one standard. The coating is still doing its job after the building is back in use, at the details as well as in the middle.
Figures for cure, thickness and strength, where they are given, come from the product data sheets. They are not a test cut out of this building.
What this asks of Torremolinos: Pool waterproofing is workmanship at the difficult line. The open field is the easy part of a resin job. Outlets, edges, penetrations and changes of plane are where thickness goes missing, and where water or wear finds the gap. The same products and the same care belong there, and the cure is allowed to finish before the building goes back into use. That is the difference between a coating that was simply applied and a system that stays in service.
06 · Products
Products on this job
Rayston Spray D50
Named on this project. The data sheet carries the application window and the typical figures.
Paintchlore 2K
Named on this project. The data sheet carries the application window and the typical figures.
07 · FAQ
Frequently asked questions
Where is this project?
Torremolinos: Pool waterproofing. España – Andalucia
When was the work done?
2019.
Which products were used?
Rayston Spray D50, Paintchlore 2K.
Why are the details done first?
Outlets, upstands and joints are where water gets in. They are closed with the same system as the main area.
Where do the cure times come from?
From the product data sheet. They describe the resin, not a clock stopped on this site.
The programme does not change because the building is smaller or further away. Prepare the substrate until it will hold the system, close the details before the field, and keep the thickness honest at every edge. A second visit to repair a starved detail costs more than doing that detail on the first day. Torremolinos: Pool waterproofing is held to that standard. Krypton Chemical supplies the resin. The applicator owns the surface.
