Steel Frame Anticorrosion Almazán: Farm Building, Soria
Steel Frame Anticorrosion Almazán: Farm Building, Soria, 750 square metres in 2022.
01 · Project overview
What is this project?
Steel Frame Anticorrosion Almazán: Farm Building, Soria, 750 square metres in 2022.
Project case study Steel Frame Anticorrosion Almazán: Farm Building, Soria This steel frame anticorrosion Almazán project protects the galvanised structure inside a farm building owned by COPISO.
The applicator APLINOR coated 750 m² with a three-coat system of single-component, moisture-cured polyurethanes.
Galvanising protects steel, but the client wanted extra, long-lasting protection inside the building.
Krypton Chemical supplies the resin system. The duty is ordinary and strict: keep water, wear and weather on the right side of the structure, and do it in the details as well as in the open field.
| Project | Steel Frame Anticorrosion Almazán: Farm Building, Soria |
|---|---|
| Area | 750 m² |
| Year | 2022 |
02 · The challenge
What did this structure ask of the system?
A roof is a field of outlets, laps and edges, and the weather works on all of them. Water does not leak through the middle of a sound bay. It gets in where the detail was thin or where the deck has started to move.
Steel Frame Anticorrosion Almazán: Farm Building, Soria has to be closed as one system, details first, and then left to do its job without a second visit every summer. Across 750 square metres, a thin spot is not a small repair.

03 · The solution
Which system was trusted here?
The system trusted here is the one named for the job. It is chosen because it matches the substrate and the exposure, not because every building wants the same can.
On a roof the membrane has to follow outlets and upstands at the same thickness as the field. An exposed aromatic film takes a topcoat if the colour will be seen.
04 · Application
How is the system built?
The products named for Steel Frame Anticorrosion Almazán: Farm Building, Soria are applied as one build-up, details before the field. Outlets, edges and changes of plane are closed first, with the same materials as the main area. A system that changes product at the difficult line is a system with a future peel.
The deck is dry, the temperature is inside the range that product allows, and the next coat follows while the window is open. Leaving a detail for the following week is how these jobs come back.
On Steel Frame Anticorrosion Almazán: Farm Building, Soria the roof fails at the edge long before it fails in the field. Parapets, outlets, plant plinths and laps are detailed first, with the same system, at the same thickness. A bay can be perfect and the ceiling still stains if the outlet was a collar of mastic.
The deck moves between the hot afternoon and the night. The membrane has to move with it. A rigid coat maps every crack in the substrate onto the ceiling. Thermal movement is the reason an elastic system is on a roof like this, not a preference for a particular can.
Where the film stays in the sun, colour and waterproofing are two layers. The membrane keeps the water out. An aliphatic coat keeps the appearance. Skipping the topcoat because the membrane is already waterproof is how a sound roof starts to look failed, and then gets recoated for the wrong reason.
05 · Results
What does a job like this stand behind?
Steel Frame Anticorrosion Almazán: Farm Building, Soria has one standard. The coating is still doing its job after the building is back in use, at the details as well as in the middle. The area on this job is 750 square metres.
Figures for cure, thickness and strength, where they are given, come from the product data sheets. They are not a test cut out of this building.
What this asks of Steel Frame Anticorrosion Almazán: Farm Building, Soria is workmanship at the difficult line. The open field is the easy part of a resin job. Outlets, edges, penetrations and changes of plane are where thickness goes missing, and where water or wear finds the gap. The same products and the same care belong there, and the cure is allowed to finish before the building goes back into use. That is the difference between a coating that was simply applied and a system that stays in service.
06 · Products
Products on this job
Resin system
The coating system used on this structure. Details follow the product data for the materials applied.
07 · FAQ
Frequently asked questions
Where is this project?
Steel Frame Anticorrosion Almazán: Farm Building, Soria. the place named on this project
When was the work done?
2022.
What was the duty?
Protect the structure, details included, and leave a film that can stay in service.
Why are the details done first?
Outlets, upstands and joints are where water gets in. They are closed with the same system as the main area.
Are the figures measured on this job?
No. Thickness, elongation and cure times quoted here are the products’ typical data.