EPS, theme parks and scenography

Home → Applications → EPS, theme parks and scenography

EPS, theme parks and scenography

EPS, theme parks and scenography require a build-up that connects exposure, substrate condition, detailing and maintenance. This engineering guide defines the application intent while the current technical data sheet and project specification govern execution.

EPS structures, theme parks and furniture coating layers: Concrete substrate, Krypton ProLine PU AL Primer, Krypton ProLine CH55, Krypton ProLine PU 1000 TC
System layers: EPS structures, theme parks and furniture. Concrete substrate → Krypton ProLine PU AL Primer → Krypton ProLine CH55 → Krypton ProLine PU 1000 TC.

Use and application

The application intent is eps, theme park and scenography coatings. Start by qualifying the substrate, exposure, service level and maintenance constraints. Krypton ProLine PU AL Primer, Krypton ProLine 60 EPS and Krypton ProLine PU 1000 TC are typical reference products for this application. Compare the current Products and Systems documentation, and use the associated application context at Recreational areas to keep the scope distinct.

01

Shape, impact and weathering

EPS and scenography coatings must follow complex geometry while resisting handling, weather and the intended impact level. Validate the complete build-up on a representative form before fixing production details.

02

Layers and references

Define the sequence from prepared substrate through primer or bond coat, functional membrane or body coat, reinforcement where specified, and protective or finish layer where required. Use the current technical data sheet for preparation, mixing, consumption, thickness, overcoat windows and cure; the Calculator supports quantities, while Systems and the product references establish the applicable route.

03

Common mistakes

  • Choosing a coating in isolation without checking substrate compatibility, exposure and adjacent layers.
  • Starting with dust, moisture, cracks or movement details unresolved.
  • Underestimating joints, thresholds, penetrations and future maintenance in the scope and inspection plan.

04

Operating sequence

1. Record the exposure, dimensions, substrate condition and service scenario. 2. Map joints, edges, penetrations, drains, upstands and repair zones. 3. Select a compatible route in Systems and verify every layer against the current technical data sheet. 4. Calculate quantities with the Calculator. 5. Approve a representative area, document preparation and application controls, inspect the completed build-up, and release it only when the project requirements are met.

Scroll to Top