Oviedo green roof Impermax 2K

Home / Knowledge / Oviedo green roof Impermax 2K

Oviedo green roof Impermax 2K

Green roof in Oviedo with sedum planting, drip irrigation lines and spotlights over Impermax 2K

Engineer notes. Not a blog. Green roof, Regional Health Ministry, Oviedo. Oviedo green roof Impermax 2K (two-component polyurethane) is the named membrane under planting. No area is given.

Oviedo green roof Impermax 2K (two-component hot-spray polyurethane) is the membrane named on the green roof of the Regional Health Ministry building, Oviedo. Therefore the specifier writes Impermax 2K and the planted build-up in the same sentence. Magazine NUM.3 prints no area. Do not invent one. A drip-line photograph is not a root test.

01

Why Oviedo green roof Impermax 2K needs the root mark

Catalogue 2024 prints a certificate of resistance to root penetration on Impermax 2K, with ETA 10/0296, 25 years (W3). That mark stays on this name. An aliphatic topcoat is required where the membrane sees UV before planting. Do not move the root certificate onto a 1K balcony coat.

However, do not invent kg/m². Read the current TDS, then the calculator.

See Oviedo green roof Impermax 2K on gardened roofs, Impermax 2K and documents.

Outbound reference: EOTA — European Technical Assessments.

First, name the planted roof. Then name Oviedo green roof Impermax 2K. After that, keep the root-penetration certificate on the same clause.

These notes do not replace the current TDS, SDS or a written specification. For pack sizes, mix ratio and kg/m², read the current sheet, then the calculator.

Scroll to Top