Slurry and processing tanks

Slurry and processing tanks require a continuous chemical-resistant lining matched to slurry immersion, agitation, tank geometry and agricultural or process cleaning regimes. This engineering guide frames the application intent without replacing the current system specification or product technical data sheet.

Use and application

The application intent is waterproofing of slurry and processing tanks. Start by qualifying the substrate, exposure, service level and maintenance constraints. Krypton ProLine MFE 100, Krypton ProLine AB95P and Krypton ProLine Silver TC are typical reference products for this application. Compare the current Products and Systems documentation, and use the associated application context at Livestock sheds to keep the scope distinct.

01

Slurry immersion, agitation and tank shell

Slurry tanks see organic acids, ammonia, abrasion from solids and mechanical agitation. Concrete shells bring porosity, alkalinity and cracking risk; metal tanks need controlled preparation and corrosion management. Wall–floor transitions, joints, mixers, feed and discharge connections, manways and inspection points need a continuous, documented detail before the lining route is fixed.

02

Layers and references

Define the sequence from prepared substrate through primer or bond coat, functional membrane or body coat, reinforcement where specified, and protective or finish layer where required. Use the current technical data sheet for preparation, mixing, consumption, thickness, overcoat windows and cure; the Calculator supports quantities, while Systems and the product references establish the applicable route.

03

Common mistakes

  • Treating slurry immersion and vapour-space exposure as the same service condition without checking chemical compatibility and abrasion.
  • Omitting mixers, feed and discharge connections, manways and wall–floor transitions from the lining detail.
  • Closing the lining before checking adhesion, thickness, pinholes and cure under immersion conditions.

04

Operating sequence

1. Record slurry chemistry, agitation, cleaning regime, tank dimensions, substrate condition and service scenario. 2. Map joints, transitions, mixers, connections, manways and repair areas. 3. Select a compatible route in Systems and verify every layer against the current technical data sheet. 4. Calculate quantities with the Calculator. 5. Approve a representative area, document preparation and application controls, inspect continuity and release the tank only when the project requirements are met.